BIZOMAT MAKEOS · Materials

Corrosion Rate from Mass Loss

How fast is this metal corroding, and how long will the corrosion allowance last?

Uniform corrosion rate from a coupon’s mass loss, area, exposure time and density (ASTM G1 method), in mm/year and mils/year, with the remaining life of a corrosion allowance.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Mass lossmgMass loss after cleaning, from before and after weighing.
Exposed areacm²Total exposed surface area of the coupon.
Exposure timehExposure time.
Metal densityg/cm³Density of the metal (carbon steel 7.86, stainless about 7.9, copper 8.96 g/cm³).
Remaining corrosion allowancemmWall thickness still available before the minimum required thickness.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Mass loss
Illustration: Mass lossA weight resting on a scale; Mass loss is how much matter it contains, in kilograms or grams.WExample: 120 mgMass loss
What it is
The mass the corrosion coupon lost during exposure, found by weighing it before exposure and again after cleaning off the corrosion products.
Units and format
Enter a number in mg: mg. The form accepts 0.000001 mg or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 120 mg as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The corrosion rate rises in direct proportion to mass loss.
Get it right
Enter milligrams, not grams, and weigh after cleaning, not with the scale still attached.
What this means: Exposed area
Illustration: Exposed areaA shaded shape whose enclosed surface is the area Exposed area.AenclosedsurfaceExample: 20 cm²Exposed area
What it is
The total surface area of the coupon that was exposed to the environment, including edges and both faces.
Units and format
Enter a number in cm²: square centimetres. The form accepts 0.000001 cm² to 100000000 cm². Required: the tool does not calculate until every input is valid.
Example
The form opens with 20 cm² as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A larger area spreads the same loss thinner, so the rate falls in inverse proportion.
Get it right
Enter square centimetres; include the edges and subtract any masked or mounted area.
What this means: Exposure time
Illustration: Exposure timeA timeline from a start mark to an end mark; Exposure time is the time between them.startendTExample: 720 hExposure time
What it is
The time the coupon spent exposed to the environment, from installation to removal.
Units and format
Enter a number in h: hours. The form accepts 0.000001 h to 10000000 h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 720 h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A longer exposure for the same loss gives a lower rate.
Get it right
Enter hours: a 30-day exposure is 720 hours.
What this means: Metal density
Illustration: Metal densityA cube of material: density Metal density is its mass divided by the volume it fills.massvolumeρExample: 7.86 g/cm³Metal density
What it is
The density of the coupon metal, used to turn mass loss into thickness loss.
Units and format
Enter a number in g/cm³: grams per cubic centimetre (1 g/cm³ = 1000 kg/m³). The form accepts 0.000001 g/cm³ to 25 g/cm³. Required: the tool does not calculate until every input is valid.
Example
The form opens with 7.86 g/cm³ as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The rate falls in inverse proportion to density.
Get it right
Enter grams per cubic centimetre, not kilograms per cubic metre.
What this means: Remaining corrosion allowance
Illustration: Remaining corrosion allowanceThe cross-section of a plate or wall with a dimension across its thickness, marking Remaining corrosion allowance.CAsection through the materialExample: 1.5 mmRemaining corrosion allowance
What it is
The wall thickness still available before the part reaches its minimum required thickness, used to estimate the remaining life at the measured rate.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 1000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1.5 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Remaining life is this allowance divided by the rate, so it rises in proportion.
Get it right
Use the measured current thickness minus the minimum required thickness, not the original design allowance.

Method and formulas

  1. CR (mm/y) = 87.6 × W ÷ (ρ A T), W in mg, A in cm², T in hours.
  2. mils per year = mm/y × 39.37.
  3. Remaining life = allowance ÷ rate.
  4. Example: 120 mg lost from 20 cm² over 720 h is 0.092875 mm/y (3.6565 mpy).

Limitations

  • Uniform corrosion only; pitting and crevice corrosion can perforate much sooner.
  • Coupon conditions must represent the equipment (flow, temperature, deposits).
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Evaluate corrosion coupons from tanks, cooling water or process lines
  • Estimate remaining life from a corrosion allowance
  • Compare materials in a test

Who it is for

  • Materials engineers
  • Maintenance and reliability engineers
  • Water treatment specialists

What you get

  • Corrosion rate in mm/year and mils/year
  • Remaining life of the allowance

Interpreting the result

  • Back up coupon results with thickness measurements on the equipment.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 1500–1516. Topic reference; no source tables or recommended settings are reproduced.
  • ASTM G1 Standard Practice for Preparing, Cleaning, and Evaluating Corrosion Test Specimens

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Corrosion Rate from Mass Loss calculator