Average Force of a Blow (Drop Hammer or Pile Driver)

What average force does this falling weight deliver when it drives the work a given distance?

Average force of a blow from a falling weight — a drop hammer, pile driver or drop-test mass — by equating the work of the fall (including the penetration) with force × penetration, with impact speed, energy and an efficiency for losses.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Falling masskgMass of the ram, hammer or drop weight.
Drop height before contactmHeight of the drop to first contact.
Penetration or set per blowmmDistance the work moves (deforms or is driven) during the blow.
Efficiency (share of energy into the work)%Fraction of the energy that does useful work; the handbook formula neglects losses (100%).

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Falling mass
Illustration: Falling massA weight resting on a scale; Falling mass is how much matter it contains, in kilograms or grams.mExample: 500 kgFalling mass
What it is
The mass of the part that falls and strikes: the ram, hammer head, pile-driver monkey or drop-test weight, including anything that moves with it.
Units and format
Enter a number in kg: kilograms. The form accepts 0.000001 kg to 10000000 kg. Required: the tool does not calculate until every input is valid.
Example
The form opens with 500 kg as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The average force is directly proportional to the falling mass.
Get it right
Use mass in kilograms, not weight in newtons; the tool applies gravity itself.
What this means: Drop height before contact
Illustration: Drop height before contactA block with a vertical dimension line from its base to its top, marking the height Drop height before contact.hExample: 1.5 mDrop height before contact
What it is
The height the mass falls freely before it first touches the work. The tool adds the penetration to this height when it works out the energy.
Units and format
Enter a number in m: metres. The form accepts 0.000001 m to 1000 m. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1.5 m as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
More drop height raises the energy and impact speed, and the force with them.
Get it right
This is in metres while the penetration is in millimetres.
What this means: Penetration or set per blow
Illustration: Penetration or set per blowA surface with a step cut into it and a dimension from the original surface down to the bottom of the step, marking Penetration or set per blow.soriginal surfaceExample: 10 mmPenetration or set per blow
What it is
How far the work moves or deforms during one blow: the set of a pile per blow, or the crush of a forging or test piece. The fall’s energy is spread over this distance.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 10 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The force is roughly inversely proportional to the penetration: halve it and the force about doubles.
Get it right
Measure the permanent set per blow from markings over several blows; a small error in a small set changes the force a lot.
What this means: Efficiency (share of energy into the work)
Illustration: Efficiency (share of energy into the work)Input on the left and useful output on the right with the loss split off; Efficiency (share of energy into the work) is output divided by input.inputuseful outputlossηExample: 100%Efficiency (share of energy into the work)
What it is
The share of the fall’s energy that actually does work on the pile or workpiece; the rest is lost to rebound, heat, sound and guide friction.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 1% to 100%. Required: the tool does not calculate until every input is valid.
Example
The form opens with 100% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The average force is directly proportional to the efficiency.
Get it right
The handbook formula assumes no losses (100 %). Any lower value should come from measurement or the equipment supplier, not a guess.

Method and formulas

  1. Work of fall = W S, with S the total height including the penetration d.
  2. Average force × d = W S, so F = η m g (h + d) ÷ d.
  3. Impact speed = √(2 g h).
  4. Example: 500 kg falling 1.5 m with a 10 mm set delivers about 740.4 kN.

Limitations

  • Average force only; peak force is higher and depends on stiffness.
  • Losses from rebound, heat and elastic strain reduce the useful force.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Estimate the force delivered by a drop hammer or press
  • Size a stop or anvil for a drop test
  • Check pile driving resistance from set per blow

Who it is for

  • Forging supervisors
  • Test engineers
  • Civil and site engineers

What you get

  • Average force of the blow
  • Impact speed and energy
  • Force in weight terms

Interpreting the result

  • Halving the penetration doubles the average force: hard stops see very high forces.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 183–184. Topic reference; no source tables or recommended settings are reproduced.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Average Force of a Blow (Drop Hammer or Pile Driver) calculator