Jig and Fixture Return on Investment

Is this jig or fixture worth building?

Calculates payback and first-year return of a jig or fixture from time, scrap and maintenance effects.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Design and build investment$Design and build cost
Time saved / runminTime saved per run (trial or estimate)
Runs / monthrunsRuns per month from the schedule
Labour rate$/hrLoaded labour rate
Monthly scrap and rework savings$Monthly scrap and rework reduction
Fixture maintenance / month$Monthly fixture maintenance and calibration

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Design and build investment
Illustration: Design and build investmentA stack of coins and a note representing the money amount Design and build investment.$Example: $6000Design and build investment
What it is
The one-off cost to design, build and prove the jig or fixture, including materials, machining and try-out time.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $6000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Payback in months rises in proportion; first-year ROI falls.
Get it right
Include design time and first-article checks, not just materials and machining.
What this means: Time saved / run
Illustration: Time saved / runA timeline from a start mark to an end mark; Time saved / run is the time between them.startendtExample: 20 minTime saved / run
What it is
The labour time the fixture saves each time the job is run, compared with the current method, from a trial or estimate.
Units and format
Enter a number in min: minutes. The form accepts 0 min or more.
Example
The form opens with 20 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Labour saving rises in proportion.
Get it right
Enter minutes per run, not per part, unless each run is one part.
What this means: Runs / month
Illustration: Runs / monthItems moving past a point on a conveyor; Runs / month is how many pass in each unit of time.count pointExample: 80 runsRuns / month
What it is
How many times a month the job that uses the fixture is run, from the production schedule.
Units and format
Enter a number in runs: runs. The form accepts 0 runs or more.
Example
The form opens with 80 runs as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Labour saving rises in proportion.
Get it right
Use the expected usage over the fixture’s life, not a single busy month.
What this means: Labour rate
Illustration: Labour rateA price tag on one unit of measure; Labour rate is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $55/hrLabour rate
What it is
The full hourly cost of the operator whose time is saved, including on-costs such as superannuation, leave and payroll tax.
Units and format
Enter a number in $/hr: money per hour. The form accepts $0/hr or more.
Example
The form opens with $55/hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Labour saving rises in proportion.
Get it right
Use the loaded rate from finance.
What this means: Monthly scrap and rework savings
Illustration: Monthly scrap and rework savingsA stack of coins and a note representing the money amount Monthly scrap and rework savings.$Example: $400Monthly scrap and rework savings
What it is
The monthly cost of scrap and rework the fixture is expected to avoid through better location and repeatability.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $400 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds directly to the monthly benefit.
Get it right
Base it on current scrap records for the job; leave it at 0 if no improvement is expected.
What this means: Fixture maintenance / month
Illustration: Fixture maintenance / monthA stack of coins and a note representing the money amount Fixture maintenance / month.$Example: $50Fixture maintenance / month
What it is
The monthly cost of keeping the fixture in service: inspection, calibration, wear parts and repairs.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $50 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Subtracted from the monthly benefit.
Get it right
Spread annual calibration costs over 12 months.

Method and formulas

  1. Monthly benefit = time saved ÷ 60 × runs × rate + scrap saving − maintenance
  2. Payback = investment ÷ monthly benefit
  3. Bands: up to 12 months strong, up to 24 review (tool defaults)

Limitations

  • Assumes usage continues at the entered rate

Typical uses

  • Approving fixture builds
  • Comparing fixture designs

Who it is for

  • Manufacturing engineers
  • Toolroom and production managers

What you get

  • STRONG CASE, REVIEW / JUSTIFY or WEAK CASE
  • Payback in months and first-year ROI

Interpreting the result

  • Replace the 12 and 24-month bands with your own payback policy

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Jig and Fixture Return on Investment calculator