BIZOMAT MAKEOS · Fabrication

Sheet-Metal Bracket: Flat Blank, Nesting, Bending Force and Cost

What flat blank, sheet yield, bending force and cost per part does this bent sheet-metal bracket have?

Cost build-up of a one- or two-bend sheet-metal part: developed flat length from outside dimensions with the bend allowance and deduction (K-factor), parts per sheet in the better orientation with spacing, material utilisation and cost per part, press brake force per bend, and labour cost from bend and blanking times with set-up spread over the batch.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Part
First flange (outside)mmOutside length of the first flange.
Web (outside)mmOutside length of the web between bends.
Second flange (outside, 0 = one bend)mmOutside length of the second flange (0 for an L-bracket).
Part widthmmWidth of the part along the bend line.
ThicknessmmMaterial thickness.
Inside bend radiusmmInside radius of the bends.
K-factorK-factor locating the neutral axis (about 0.33–0.45 for air bending).
Bend angle°Bend angle of each bend.
Sheet and material
Sheet lengthmmLength of the stock sheet.
Sheet widthmmWidth of the stock sheet.
Spacing and edge marginmmSpacing between blanks and at the sheet edge.
Densitykg/m³Material density.
Sheet price$/kgPrice of the sheet per kilogram.
Tensile strengthMPaTensile strength of the sheet.
Press brake and labour
Die openingmmOpening of the bending die (6–12 × thickness).
Air-bending factorAir-bending force factor (1.33 is common).
Shop rate$/hMachine and labour rate.
Time per bendsHandling and bending time per bend.
Blanking time per partsTime to cut each blank.
Set-up time per batchminSet-up time for the batch.
Batch quantityParts in the batch.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

Part

What this means: First flange (outside)
Illustration: First flange (outside)A bar with a dimension line and arrows from one end to the other, marking the length First flange (outside).aExample: 50 mmFirst flange (outside)
What it is
Outside length of the first flange, from its free edge to the outside face of the web, as dimensioned on the drawing.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 50 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use outside dimensions, not inside or centreline; the bend deduction here assumes outside dimensions.
What this means: Web (outside)
Illustration: Web (outside)A bar with a dimension line and arrows from one end to the other, marking the length Web (outside).bExample: 80 mmWeb (outside)
What it is
Outside length of the web, the leg between the bends, measured over the outside faces (to the free edge on an L-bracket).
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 80 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Outside dimension over both bends, as for the flanges.
What this means: Second flange (outside, 0 = one bend)
Illustration: Second flange (outside, 0 = one bend)A bar with a dimension line and arrows from one end to the other, marking the length Second flange (outside, 0 = one bend).cExample: 50 mmSecond flange (outside, 0 = one bend)
What it is
Outside length of the second flange of a channel or U-bracket, measured from its free edge to the outside face of the web.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 50 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
0 = one bend: the part becomes an L-bracket and the blank has one bend deduction instead of two.
What this means: Part width
Illustration: Part widthA bar with a dimension line and arrows from one end to the other, marking the length Part width.WExample: 100 mmPart width
What it is
Width of the part measured along the bend line, which is also the length of each bend formed on the press brake.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 100 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Bending force rises in proportion to width; it also sets the blank width for nesting.
What this means: Thickness
Illustration: ThicknessThe cross-section of a plate or wall with a dimension across its thickness, marking Thickness.tsection through the materialExample: 2 mmThickness
What it is
Thickness of the sheet, from the material order or a micrometer reading of the actual stock.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 30 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 2 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Bending force rises with the square of thickness for the same die opening.
Get it right
Measure the sheet; gauge numbers mean different thicknesses for different materials and standards.
What this means: Inside bend radius
Illustration: Inside bend radiusA circle with a line from its centre to its edge, marking the radius Inside bend radius; the radius is half the diameter.Rcentre to edge= half the diameterExample: 2 mmInside bend radius
What it is
Radius on the inside of each bend, as dimensioned on the drawing or as produced by the punch and die.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 500 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 2 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Inside radius, not outside: outside radius = inside radius + thickness.
What this means: K-factor
Illustration: K-factorTwo bars: a base value and the same value multiplied by K-factor, the factor.base valuewith factorkExample: 0.4K-factor
What it is
Where the neutral layer, which neither stretches nor shrinks, sits within the thickness, as a fraction of thickness from the inside face. It sets the bend allowance.
Units and format
Enter a plain number with no unit. The form accepts 0.2 to 0.5. Required: the tool does not calculate until every input is valid.
Example
The form opens with 0.4 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Best found from a test bend on your own press brake and material; it varies with radius, thickness and bending method.
What this means: Bend angle
Illustration: Bend angleTwo lines meeting at a point with an arc between them, marking the angle Bend angle.θExample: 90°Bend angle
What it is
Angle each bend turns the material through, measured from flat. Both bends of a channel use this same angle.
Units and format
Enter a number in °: degrees of angle. The form accepts 10° to 175°. Required: the tool does not calculate until every input is valid.
Example
The form opens with 90° as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Bend angle from flat, not the included angle between flanges: an included angle of 120° is a 60° bend.

Sheet and material

What this means: Sheet length
Illustration: Sheet lengthA bar with a dimension line and arrows from one end to the other, marking the length Sheet length.L_sExample: 2500 mmSheet length
What it is
Length of the stock sheet the blanks are cut from, as bought from the supplier.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 2500 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Sheet width
Illustration: Sheet widthA bar with a dimension line and arrows from one end to the other, marking the length Sheet width.W_sExample: 1250 mmSheet width
What it is
Width of the stock sheet the blanks are cut from, the shorter side of a standard sheet as bought.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1250 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Spacing and edge margin
Illustration: Spacing and edge marginTwo parts separated by a small gap with a dimension across the gap, marking Spacing and edge margin.cExample: 5 mmSpacing and edge margin
What it is
Clear space left between neighbouring blanks and at the sheet edges for the cutting kerf, piercing and handling.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 200 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 5 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
The same value is used between blanks and as the margin at each sheet edge.
What this means: Density
Illustration: DensityA cube of material: density Density is its mass divided by the volume it fills.massvolumeρExample: 7850 kg/m³Density
What it is
Mass of one cubic metre of the sheet material, from the supplier or a materials reference. It turns the sheet size into kilograms for costing.
Units and format
Enter a number in kg/m³: kilograms per cubic metre. The form accepts 0.000001 kg/m³ to 20000 kg/m³. Required: the tool does not calculate until every input is valid.
Example
The form opens with 7850 kg/m³ as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Sheet price
Illustration: Sheet priceA price tag on one unit of measure; Sheet price is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $1.5/kgSheet price
What it is
What you pay per kilogram of sheet, delivered, from your supplier’s current quotation.
Units and format
Enter a number in $/kg: money per kilogram. The form accepts $0/kg to $10000/kg. Required: the tool does not calculate until every input is valid.
Example
The form opens with $1.5/kg as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Material cost per part rises in direct proportion.
Get it right
The whole sheet is costed and shared over the parts, so offcuts are paid for; enter price per kilogram, not per sheet.
What this means: Tensile strength
Illustration: Tensile strengthA test bar pulled from both ends: stress Tensile strength is the force carried by each square millimetre of its cross-section.UTSstress = force ÷ areaExample: 450 MPaTensile strength
What it is
Ultimate tensile strength of the sheet material, from the mill certificate or data sheet, used to estimate the press brake force.
Units and format
Enter a number in MPa: megapascals (1 MPa = 1 N/mm²). The form accepts 0.000001 MPa to 3000 MPa. Required: the tool does not calculate until every input is valid.
Example
The form opens with 450 MPa as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Bending force is proportional to tensile strength.
Get it right
Use tensile strength, not yield strength.

Press brake and labour

What this means: Die opening
Illustration: Die openingA bar with a dimension line and arrows from one end to the other, marking the length Die opening.VExample: 16 mmDie opening
What it is
Width of the V opening of the bottom die, measured across its top edges. It sets the leverage in air bending.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 500 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 16 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Bending force is inversely proportional to the die opening.
Get it right
Measure across the top of the V, not its depth.
What this means: Air-bending factor
Illustration: Air-bending factorTwo bars: a base value and the same value multiplied by Air-bending factor, the factor.base valuewith factor×Example: 1.33Air-bending factor
What it is
Multiplier in the air-bending force formula that accounts for die geometry and friction, from the press brake or tooling maker.
Units and format
Enter a plain number with no unit. The form accepts 1 to 2. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1.33 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Bending force is proportional to this factor.
What this means: Shop rate
Illustration: Shop rateA price tag on one unit of measure; Shop rate is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $90/hShop rate
What it is
Hourly charge for the machines and operator together, including overheads, applied to blanking, bending and set-up time.
Units and format
Enter a number in $/h: money per hour. The form accepts $0/h to $10000/h. Required: the tool does not calculate until every input is valid.
Example
The form opens with $90/h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Time per bend
Illustration: Time per bendA timeline from a start mark to an end mark; Time per bend is the time between them.startendtExample: 15 sTime per bend
What it is
Time to pick up, position and form one bend on one part, including turning the part between bends.
Units and format
Enter a number in s: seconds. The form accepts 0 s to 3600 s. Required: the tool does not calculate until every input is valid.
Example
The form opens with 15 s as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Labour cost per part rises with the number of bends times this time.
Get it right
Seconds per bend per part; a channel has two bends, so its time counts twice.
What this means: Blanking time per part
Illustration: Blanking time per partA timeline from a start mark to an end mark; Blanking time per part is the time between them.startendtExample: 20 sBlanking time per part
What it is
Time to cut one blank from the sheet on the laser, punch or shear, including its share of sheet loading and unloading.
Units and format
Enter a number in s: seconds. The form accepts 0 s to 3600 s. Required: the tool does not calculate until every input is valid.
Example
The form opens with 20 s as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Seconds per part, not per sheet.
What this means: Set-up time per batch
Illustration: Set-up time per batchA timeline from a start mark to an end mark; Set-up time per batch is the time between them.startendtExample: 60 minSet-up time per batch
What it is
Time to change over the cutting machine and press brake for this part, shared across every part in the batch.
Units and format
Enter a number in min: minutes. The form accepts 0 min to 100000 min. Required: the tool does not calculate until every input is valid.
Example
The form opens with 60 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Its cost per part falls in proportion to batch size.
Get it right
Minutes, not seconds or hours.
What this means: Batch quantity
Illustration: Batch quantityA row of identical items being counted; Batch quantity is how many there are.nExample: 200Batch quantity
What it is
Number of parts made in one run after a single set-up.
Units and format
Enter a plain number with no unit. The form accepts 1 to 100000000. Use a whole number. Required: the tool does not calculate until every input is valid.
Example
The form opens with 200 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Larger batches spread the set-up cost over more parts.

Method and formulas

  1. Bend allowance BA = θ (R + k t); outside setback = (R + t) tan(θ ÷ 2); deduction = 2 × setback − BA (as the bend allowance tool).
  2. Flat length = sum of outside dimensions − bends × deduction.
  3. Parts per sheet = best of the two orientations of ⌊(L_s − gap) ÷ (blank + gap)⌋ × ⌊(W_s − gap) ÷ (width + gap)⌋.
  4. Bend force = k W t² UTS ÷ V; cost = sheet cost ÷ parts + rate × (bends × t_bend + t_blank) + set-up share.
  5. Example: the default bracket blanks at 172.8 × 100 mm, nests 161 per sheet and costs about 2.1571 each.

Limitations

  • Rectangular blanks on a simple grid; true nesting software can do better.
  • Holes, notches and finishing are not costed.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Quote a bent bracket or cover
  • Choose sheet size for best yield
  • Check press brake capacity for a part

Who it is for

  • Estimators
  • Fabrication supervisors
  • Design engineers

What you get

  • Flat blank and parts per sheet
  • Bending force
  • Cost per part

Interpreting the result

  • Utilisation under about 75% suggests trying another sheet size or orientation.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 1346–1353. Topic reference; no source tables or recommended settings are reproduced.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Sheet-Metal Bracket: Flat Blank, Nesting, Bending Force and Cost calculator