BIZOMAT MAKEOS · Hydraulics

Tank Drain Time Check (Volume Drained, Initial Outflow, Time Through an Orifice)

How long will this vertical tank take to drain from one level to another through a bottom outlet, and what outlet size would drain it in the time I want?

Drain time of a vertical cylindrical tank through a bottom orifice or short outlet: the volume between the two levels (as the tank volume tool), the outflow at the starting level from the head as a pressure drop (as the orifice flow tool), the time to fall from the starting to the final level with the head falling as the tank empties, and the outlet diameter that would drain it in your time, against the time allowed.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Tank inside diametermmInside diameter of the tank.
Starting level above the outletmmLiquid level above the outlet at the start.
Final level above the outletmmLiquid level above the outlet when draining stops.
Outlet diametermmOutlet diameter.
Discharge coefficientDischarge coefficient of the outlet (about 0.6 for a sharp orifice, 0.8 for a short pipe).
Liquid densitykg/m³Liquid density (for the outflow as a pressure drop).
Time allowedminTime the drain must take at most.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Tank inside diameter
Illustration: Tank inside diameterA circle with a line straight through its centre from edge to edge, marking the diameter Tank inside diameter.Dmeasured acrossthe centreExample: 1200 mmTank inside diameter
What it is
The inside diameter of the vertical cylindrical tank, which sets the liquid volume per millimetre of level.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1200 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Drain time rises with the square of the tank diameter.
Get it right
Use the inside diameter; the outside diameter overstates volume and drain time.
What this means: Starting level above the outlet
Illustration: Starting level above the outletA block with a vertical dimension line from its base to its top, marking the height Starting level above the outlet.H₁Example: 1500 mmStarting level above the outlet
What it is
The height of the liquid surface above the outlet when draining starts.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1500 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Measure to the outlet centre line, not to the tank floor.
What this means: Final level above the outlet
Illustration: Final level above the outletA block with a vertical dimension line from its base to its top, marking the height Final level above the outlet.H₂Example: 100 mmFinal level above the outlet
What it is
The height of the liquid surface above the outlet when you consider the drain finished.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 100000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 100 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
It must be below the starting level; the last part of the drain is the slowest.
What this means: Outlet diameter
Illustration: Outlet diameterA circle with a line straight through its centre from edge to edge, marking the diameter Outlet diameter.dmeasured acrossthe centreExample: 25 mmOutlet diameter
What it is
The diameter of the outlet opening through which the tank drains.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 5000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 25 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Drain time falls with the square of the outlet diameter.
Get it right
Use the narrowest bore in the outlet, such as a valve port, not the pipe nominal size.
What this means: Discharge coefficient
Illustration: Discharge coefficientTwo bars: a base value and the same value multiplied by Discharge coefficient, the factor.base valuewith factorC_dExample: 0.6Discharge coefficient
What it is
The ratio of the actual outflow to the ideal outflow through the same opening, allowing for jet contraction and friction.
Units and format
Enter a plain number with no unit. The form accepts 0.1 to 1. Required: the tool does not calculate until every input is valid.
Example
The form opens with 0.6 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Drain time falls in direct proportion as the coefficient rises.
Get it right
Choose it for the outlet shape from a fluid-flow reference or the valve maker; valves and long pipes lower it.
What this means: Liquid density
Illustration: Liquid densityA cube of material: density Liquid density is its mass divided by the volume it fills.massvolumeρExample: 1000 kg/m³Liquid density
What it is
Mass per cubic metre of the liquid. Here it only converts the starting head into a pressure for the report; drain time and outflow do not depend on it.
Units and format
Enter a number in kg/m³: kilograms per cubic metre. The form accepts 0.000001 kg/m³ to 25000 kg/m³. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1000 kg/m³ as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use the density at working temperature from the liquid data sheet.
What this means: Time allowed
Illustration: Time allowedA timeline from a start mark to an end mark; Time allowed is the time between them.startendtExample: 30 minTime allowed
What it is
The longest time the drain may take, compared with the calculated drain time.
Units and format
Enter a number in min: minutes. The form accepts 0.000001 min to 1000000 min. Required: the tool does not calculate until every input is valid.
Example
The form opens with 30 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Enter minutes, not seconds.

Method and formulas

  1. Volume = π D² (H₁ − H₂) ÷ 4 (as the tank volume tool).
  2. Outflow at the start Q = C_d A √(2 Δp ÷ ρ) with Δp = ρ g H₁ (as the orifice flow tool).
  3. Time t = (A_tank ÷ C_d A_outlet) √(2 ÷ g) (√H₁ − √H₂); the outlet for a time t₀ is d √(t ÷ t₀).
  4. Example: 1,583.4 L drains in 26.258 min; a 23.389 mm outlet would meet the time allowed.

Limitations

  • Unrestricted outflow to air from a tank open at the top; a vented, pumped or piped outlet changes the flow.
  • Outlet losses taken in the discharge coefficient; long drain pipes need the pipe friction tool.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Find how long a tank takes to drain for cleaning
  • Size a drain outlet for an emergency dump
  • Estimate outflow from a tank at a given level

Who it is for

  • Process engineers
  • Plant operators
  • Maintenance engineers

What you get

  • Volume drained
  • Outflow at the start
  • Drain time and outlet for the time allowed

Interpreting the result

  • The last part of the tank drains slowest because the head is lowest; draining fully takes far longer than draining half.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 68–69, 3024–3027. Topic reference; no source tables or recommended settings are reproduced.

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Tank Drain Time Check (Volume Drained, Initial Outflow, Time Through an Orifice) calculator