Expansion Gap Plan (Movement over the Temperature Range, Gap at Installation, Restrained Stress)

For a rail, beam, pipe or panel run that must move with temperature, what gap should I set when installing, will it stay within the joint’s range, and what stress would build up if the gap closed?

Plan of an expansion gap for a run fixed at one end: the length change over the temperature range from the expansion coefficient, the gap to set at the installation temperature so a least gap remains at the hottest temperature, the gap at the coldest temperature, the number of gaps needed if the range is too wide for one joint, and the thermal stress and force that would build up if the run were fully restrained (as the thermal stress tool).

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Length free to move to the gapmLength of the run between its fixed point and the gap.
Expansion coefficientµm/(m·K)Linear expansion coefficient of the material (steel about 12, aluminium about 23).
Lowest service temperature°CLowest temperature the run reaches.
Highest service temperature°CHighest temperature the run reaches (sun on dark surfaces can be well above air temperature).
Installation temperature°CTemperature of the run when the gap is set.
Least gap at the hottestmmSmallest gap to leave at the hottest temperature.
Largest gap the joint allowsmmLargest gap the joint, rail or cover plate can bridge.
If fully restrained
Elastic modulusGPaElastic modulus.
Cross-section areamm²Cross-section area of the run.
Yield strengthMPaYield strength of the material.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Length free to move to the gap
Illustration: Length free to move to the gapA bar with a dimension line and arrows from one end to the other, marking the length Length free to move to the gap.LExample: 30 mLength free to move to the gap
What it is
The length of the run from its fixed point, where it cannot move, to the expansion gap.
Units and format
Enter a number in m: metres. The form accepts 0.000001 m to 100000 m. Required: the tool does not calculate until every input is valid.
Example
The form opens with 30 m as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Movement rises in direct proportion to this length.
Get it right
Measure from the anchor or fixed point, not the full run if it is anchored in the middle.
What this means: Expansion coefficient
Illustration: Expansion coefficientA bar growing longer when heated; Expansion coefficient sets how much length changes for each degree of temperature change.ΔLcoldhotαExample: 12 µm/(m·K)Expansion coefficient
What it is
The linear thermal expansion coefficient of the run material: how much one metre grows per kelvin.
Units and format
Enter a number in µm/(m·K): micrometres per metre per kelvin. The form accepts 0.000001 µm/(m·K) to 100 µm/(m·K). Required: the tool does not calculate until every input is valid.
Example
The form opens with 12 µm/(m·K) as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Movement and restrained stress rise in direct proportion.
Get it right
Enter micrometres per metre per kelvin (the same as 10⁻⁶ per K) from the material data sheet.
What this means: Lowest service temperature
Illustration: Lowest service temperatureA thermometer whose level rises with Lowest service temperature; the level follows the value you type.T_minExample: -5 °CLowest service temperature
What it is
The lowest temperature the run itself reaches in service, when the gap is widest.
Units and format
Enter a number in °C: degrees Celsius. The form accepts -200 °C to 1000 °C. Required: the tool does not calculate until every input is valid.
Example
The form opens with -5 °C as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use the metal temperature, which can fall below air temperature on clear nights.
What this means: Highest service temperature
Illustration: Highest service temperatureA thermometer whose level rises with Highest service temperature; the level follows the value you type.T_maxExample: 45 °CHighest service temperature
What it is
The highest temperature the run itself reaches in service, when the gap is narrowest.
Units and format
Enter a number in °C: degrees Celsius. The form accepts -200 °C to 1500 °C. Required: the tool does not calculate until every input is valid.
Example
The form opens with 45 °C as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use the metal temperature, which can be well above air temperature in the sun.
What this means: Installation temperature
Illustration: Installation temperatureA thermometer whose level rises with Installation temperature; the level follows the value you type.T_iExample: 20 °CInstallation temperature
What it is
The temperature of the run on the day the gap is set during installation.
Units and format
Enter a number in °C: degrees Celsius. The form accepts -200 °C to 1500 °C. Required: the tool does not calculate until every input is valid.
Example
The form opens with 20 °C as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Measure the metal temperature at installation and recalculate the gap on the day.
What this means: Least gap at the hottest
Illustration: Least gap at the hottestTwo parts separated by a small gap with a dimension across the gap, marking Least gap at the hottest.g_minExample: 2 mmLeast gap at the hottest
What it is
The smallest gap you want left at the hottest temperature, so the ends never touch.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 1000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 2 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Allow for installation tolerance and any debris that may enter the gap.
What this means: Largest gap the joint allows
Illustration: Largest gap the joint allowsTwo parts separated by a small gap with a dimension across the gap, marking Largest gap the joint allows.g_maxExample: 25 mmLargest gap the joint allows
What it is
The widest gap the joint, rail joint or cover plate can bridge, compared with the gap at the coldest temperature.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 25 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Take it from the joint or cover plate design.

If fully restrained

What this means: Elastic modulus
Illustration: Elastic modulusA stress against strain graph whose straight starting slope is the stiffness value Elastic modulus.stressstrainEExample: 200 GPaElastic modulus
What it is
The elastic modulus of the run material, used for the stress if the run were fully restrained.
Units and format
Enter a number in GPa: gigapascals (1 GPa = 1000 MPa). The form accepts 0.000001 GPa to 1000 GPa. Required: the tool does not calculate until every input is valid.
Example
The form opens with 200 GPa as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Enter it in GPa, not MPa.
What this means: Cross-section area
Illustration: Cross-section areaA shaded shape whose enclosed surface is the area Cross-section area.AenclosedsurfaceExample: 2000 mm²Cross-section area
What it is
The cross-section area of the run, used for the force on the anchors if it were fully restrained.
Units and format
Enter a number in mm²: square millimetres. The form accepts 0.000001 mm² or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 2000 mm² as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The restrained force rises in direct proportion.
Get it right
Take it from the section table for the member.
What this means: Yield strength
Illustration: Yield strengthA test bar pulled from both ends: stress Yield strength is the force carried by each square millimetre of its cross-section.S_ystress = force ÷ areaExample: 250 MPaYield strength
What it is
The yield strength of the run material, compared with the restrained stress.
Units and format
Enter a number in MPa: megapascals (1 MPa = 1 N/mm²). The form accepts 0.000001 MPa to 100000 MPa. Required: the tool does not calculate until every input is valid.
Example
The form opens with 250 MPa as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use the minimum yield from the material standard.

Method and formulas

  1. Length change = α L ΔT.
  2. Gap to set = least gap + α L (T_max − T_install); gap when coldest = gap to set + α L (T_install − T_min).
  3. Gaps needed = ⌈α L (T_max − T_min) ÷ (largest − least gap)⌉; restrained stress = E α (T_max − T_install) and force = stress × area (as the thermal stress tool).
  4. Example: set a 11 mm gap at 20 °C; it opens to 20 mm when coldest; restrained, the run would see 60 MPa.

Limitations

  • Uniform temperature along the run and free sliding; friction at supports takes up part of the movement.
  • One fixed point per run; runs fixed at both ends need the joint in between to take both movements.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Set gaps for crane or conveyor rails
  • Plan expansion joints in long cladding or pipe runs
  • See the stress if a gap closes

Who it is for

  • Site engineers
  • Maintenance engineers
  • Design engineers

What you get

  • Movement over the range
  • Gap to set and gap when coldest
  • Gaps needed and restrained stress

Interpreting the result

  • Setting the gap for the temperature on the day of installation is what keeps the joint inside its range in summer and winter.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 375–376, 578. Topic reference; no source tables or recommended settings are reproduced.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Expansion Gap Plan (Movement over the Temperature Range, Gap at Installation, Restrained Stress) calculator