BIZOMAT Tools · Decide

Make or Buy (detailed cost comparison)

Should you manufacture this internally or buy it from a supplier?

A detailed annual make-or-buy comparison that separates material, labour, variable overhead, freight and fixed costs, with a cost build-up table.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Annual quantityunitsAnnual demand forecast for the part
Make material / unit$/unitBill of materials cost per unit from the costing system
Make labour / unit$/unitStandard labour time × loaded labour rate
Make variable overhead / unit$/unitVariable overhead rate from finance (energy, consumables per unit)
Annual make fixed cost$Annual fixed costs that would stop if you bought (avoidable fixed cost)
Supplier price / unit$/unitSupplier quotation at the forecast volume
Freight / landed cost / unit$/unitFreight, duty, packaging and inspection per unit (landed cost)
Annual supplier/setup cost$Annual supplier set-up, tooling amortisation or account costs

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Annual quantity
Illustration: Annual quantityA row of identical items being counted; Annual quantity is how many there are.QExample: 10000 unitsAnnual quantity
What it is
The number of parts needed in a year, from the demand forecast. All annual costs and the per-unit comparison are worked out at this volume.
Units and format
Enter a number in units: a count of units. The form accepts 1 units or more.
Example
The form opens with 10000 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Higher volume favours the option with the lower variable cost per unit.
Get it right
Check the answer at your low and high forecasts too; a crossover near your volume makes the choice sensitive.
What this means: Make material / unit
Illustration: Make material / unitA price tag on one unit of measure; Make material / unit is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $5/unitMake material / unit
What it is
The cost of raw material and bought-in components in one unit made in-house, from the bill of materials in your costing system.
Units and format
Enter a number in $/unit: money per unit. The form accepts $0/unit or more.
Example
The form opens with $5/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds to the make variable cost, multiplied by the annual quantity.
Get it right
Include scrap and offcut allowance; material that is wasted is still paid for.
What this means: Make labour / unit
Illustration: Make labour / unitA price tag on one unit of measure; Make labour / unit is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $3/unitMake labour / unit
What it is
The direct labour cost of making one unit: the standard time per unit multiplied by the loaded labour rate.
Units and format
Enter a number in $/unit: money per unit. The form accepts $0/unit or more.
Example
The form opens with $3/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds to the make variable cost, multiplied by the annual quantity.
Get it right
Use the loaded rate including on-costs, and convert minutes to hours before multiplying.
What this means: Make variable overhead / unit
Illustration: Make variable overhead / unitA price tag on one unit of measure; Make variable overhead / unit is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $1.5/unitMake variable overhead / unit
What it is
Overhead that rises with each unit made in-house, such as machine energy, consumables and tooling wear, from finance’s variable overhead rate.
Units and format
Enter a number in $/unit: money per unit. The form accepts $0/unit or more.
Example
The form opens with $1.5/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds to the make variable cost, multiplied by the annual quantity.
Get it right
Leave out fixed overhead such as rent; it does not change with this decision unless it would stop.
What this means: Annual make fixed cost
Illustration: Annual make fixed costA stack of coins and a note representing the money amount Annual make fixed cost.$Example: $15000Annual make fixed cost
What it is
The yearly fixed cost of making in-house that would stop if you bought instead, such as dedicated tooling, equipment lease or a dedicated operator.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $15000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Added once to the annual make cost; higher values raise the crossover volume.
Get it right
Include only avoidable fixed costs; shared overhead that continues either way is not relevant.
What this means: Supplier price / unit
Illustration: Supplier price / unitA price tag on one unit of measure; Supplier price / unit is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $11/unitSupplier price / unit
What it is
The supplier’s quoted price for one unit at your annual volume, before freight and landed costs.
Units and format
Enter a number in $/unit: money per unit. The form accepts $0/unit or more.
Example
The form opens with $11/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds to the buy variable cost, multiplied by the annual quantity.
Get it right
Confirm the quote is for your volume and specification; price breaks change the comparison.
What this means: Freight / landed cost / unit
Illustration: Freight / landed cost / unitA price tag on one unit of measure; Freight / landed cost / unit is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $0.75/unitFreight / landed cost / unit
What it is
The extra cost per unit to get bought parts into your store: freight, duty, packaging, incoming inspection and handling.
Units and format
Enter a number in $/unit: money per unit. The form accepts $0/unit or more.
Example
The form opens with $0.75/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds to the buy variable cost, multiplied by the annual quantity.
Get it right
Spread lump-sum shipment costs over the units in each shipment to get a per-unit figure.
What this means: Annual supplier/setup cost
Illustration: Annual supplier/setup costA stack of coins and a note representing the money amount Annual supplier/setup cost.$Example: $3000Annual supplier/setup cost
What it is
Yearly fixed costs of buying: supplier set-up charges, tooling amortisation, account fees or supplier management time.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $3000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Added once to the annual buy cost; higher values lower the crossover volume.
Get it right
Spread one-off supplier tooling over the years it covers so this stays an annual figure.

Method and formulas

  1. Make variable = material + labour + variable overhead per unit
  2. Buy variable = supplier price + freight and landed cost per unit
  3. Annual cost = quantity × variable cost + annual fixed cost (each option)
  4. Crossover = (make fixed − supplier fixed) ÷ (buy variable − make variable)

Limitations

  • Assumes costs are linear with volume
  • Does not value strategic capability, IP or supply-chain risk
  • Excludes inventory carrying cost differences unless included in landed cost

Typical uses

  • Sourcing decisions for production parts
  • Preparing a make-or-buy case for management
  • Insourcing reviews when volumes grow

Who it is for

  • Manufacturing engineers
  • Cost accountants
  • Supply chain and procurement managers

What you get

  • MAKE or BUY with the annual difference
  • Cost per unit of each option
  • Annual cost build-up table
  • Crossover volume

Interpreting the result

  • Only avoidable fixed costs belong in the make option
  • If the decision flips within your forecast range, gather better data before committing
  • Check the sensitivity table for the input with the most leverage

References

  • Horngren, Datar and Rajan, Cost Accounting: A Managerial Emphasis (Pearson), relevant costing chapter

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Make or Buy (detailed cost comparison) calculator