How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Material / unit | $ | Bill of materials cost including scrap allowance |
| Labour hours / unit | hr | Standard or measured labour time per unit |
| Loaded labour rate | $/hr | Fully loaded hourly rate (wages plus on-costs) from finance |
| Overhead allocation / unit | $ | Overhead allocation per unit using your approved basis |
| Other cost / unit | $ | Packaging, freight-in, consumables or royalties per unit |
| Selling price / unit (optional, 0 = not used) | $ | Selling price per unit (leave 0 if not comparing) |
What each input means
Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.
What this means: Material / unit
- What it is
- The cost of the materials and bought-in parts used in one unit, including an allowance for scrap and offcuts.
- Units and format
- Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
- Example
- The form opens with $12 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Adds directly to the true unit cost.
- Get it right
- Add the scrap allowance; material that ends in the bin is still paid for.
What this means: Labour hours / unit
- What it is
- The working time needed to make one unit, in hours, from a time study, routing standard or measured records.
- Units and format
- Enter a number in hr: hours. The form accepts 0 hr or more.
- Example
- The form opens with 0.5 hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Multiplied by the loaded rate to give labour cost per unit.
- Get it right
- Enter hours, not minutes: 30 minutes is 0.5 hours.
What this means: Loaded labour rate
- What it is
- The full cost of one hour of labour: wages plus on-costs such as superannuation, leave, payroll tax and insurance.
- Units and format
- Enter a number in $/hr: money per hour. The form accepts $0/hr or more.
- Example
- The form opens with $45/hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Multiplied by labour hours to give labour cost per unit.
- Get it right
- Use the loaded rate from finance; the base wage alone understates labour cost.
What this means: Overhead allocation / unit
- What it is
- The share of indirect costs, such as supervision, rent, power and equipment, that your costing method assigns to one unit.
- Units and format
- Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
- Example
- The form opens with $8 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Adds directly to the true unit cost.
- Get it right
- Use the allocation basis your finance team approves (labour hours, machine hours or activity).
What this means: Other cost / unit
- What it is
- Any remaining cost per unit not covered above, such as packaging, inbound freight, consumables or royalties.
- Units and format
- Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
- Example
- The form opens with $2 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Adds directly to the true unit cost.
- Get it right
- Do not repeat items already in material or overhead.
What this means: Selling price / unit (optional, 0 = not used)
- What it is
- Optional: the price you sell one unit for, so the tool can compare it with the true cost and show the margin. Leave it at 0 to calculate cost only.
- Units and format
- Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
- Example
- The form opens with $0 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Only changes the margin and the price check, never the true cost.
- Get it right
- Enter the price excluding GST; 0 switches the margin comparison off.
Method and formulas
- Labour = hours per unit × loaded rate
- True cost = material + labour + overhead + other
- Margin = (price − true cost) ÷ price
Limitations
- Overhead allocation is only as good as the basis used
- Average cost; batch-size effects are not modelled
Typical uses
- Costing a new product or job
- Checking whether a price covers full cost
- Finding the largest cost element to reduce
Who it is for
- Estimators
- Production managers
- Owners of small manufacturing businesses
What you get
- True cost per unit
- Cost breakdown with shares
- Margin against price when entered
Interpreting the result
- Reduce the largest element first
- A price below true cost may still be accepted short term only if it covers variable cost