BIZOMAT MAKEOS · Manufacturing

Bar Stock Plan for Bar-Fed Parts (Bars, Yield, Material Cost, Machine Time)

How many bars do I need for this batch of bar-fed parts, how much of the bar ends up as parts, what does the material cost, and how long will the run take?

Material and time plan for parts made from bar on a lathe or screw machine: length per part with cut-off and facing allowance, parts per bar, bars to order and stock length and mass (as the screw machine stock tool), material yield, material cost per part, machine hours from the cycle time and bar change time, and shifts needed.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Part lengthmmFinished length of one part.
Cut-off tool widthmmWidth of the cut-off (parting) tool.
Facing allowance per partmmExtra length faced off each part.
Bar lengthmmLength of the bar stock.
Remnant (unusable end)mmLength left in the collet or feeder that cannot be used.
Parts neededParts to make.
Bar mass per metrekg/mMass per metre of the bar.
Material price$/kgPrice of the bar material.
Cycle time per partsMachine cycle time per part.
Bar change timesTime to load a new bar.
Hours per shifthHours in a shift.
Least material yield accepted%Least share of bar that should end up in finished parts.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Part length
Illustration: Part lengthA bar with a dimension line and arrows from one end to the other, marking the length Part length.LExample: 25.4 mmPart length
What it is
The finished length of one part along the bar axis.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 5000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 25.4 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Cut-off tool width
Illustration: Cut-off tool widthA bar with a dimension line and arrows from one end to the other, marking the length Cut-off tool width.WExample: 1.57 mmCut-off tool width
What it is
The width of the parting (cut-off) tool: the length of bar turned into chips at each cut.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 20 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1.57 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Facing allowance per part
Illustration: Facing allowance per partA bar with a dimension line and arrows from one end to the other, marking the length Facing allowance per part.LExample: 0 mmFacing allowance per part
What it is
Any extra length faced off each part beyond the cut-off, for example to clean up the parted face.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 20 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 0 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Bar length
Illustration: Bar lengthA bar with a dimension line and arrows from one end to the other, marking the length Bar length.LExample: 3048 mmBar length
What it is
The length of each bar of stock as supplied.
Units and format
Enter a number in mm: millimetres. The form accepts 0.000001 mm to 10000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 3048 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Check whether supplied bars are cut to an exact length or are random lengths.
What this means: Remnant (unusable end)
Illustration: Remnant (unusable end)A bar with a dimension line and arrows from one end to the other, marking the length Remnant (unusable end).LExample: 100 mmRemnant (unusable end)
What it is
The length left in the collet, chuck or bar feeder at the end of each bar that cannot be made into parts.
Units and format
Enter a number in mm: millimetres. The form accepts 0 mm to 2000 mm. Required: the tool does not calculate until every input is valid.
Example
The form opens with 100 mm as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Parts needed
Illustration: Parts neededA row of identical items being counted; Parts needed is how many there are.nExample: 1000Parts needed
What it is
The number of good parts to be made from the bar stock.
Units and format
Enter a plain number with no unit. The form accepts 1 to 100000000. Use a whole number. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Bar mass per metre
Illustration: Bar mass per metreA weight resting on a scale; Bar mass per metre is how much matter it contains, in kilograms or grams.mExample: 1.2 kg/mBar mass per metre
What it is
The mass of one metre of the bar stock, from the supplier’s catalogue or from the section area times density.
Units and format
Enter a number in kg/m: kilograms per metre of length. The form accepts 0.000001 kg/m to 1000 kg/m. Required: the tool does not calculate until every input is valid.
Example
The form opens with 1.2 kg/m as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Material price
Illustration: Material priceA price tag on one unit of measure; Material price is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $3/kgMaterial price
What it is
What you pay per kilogram for the bar material, from the supplier’s quotation.
Units and format
Enter a number in $/kg: money per kilogram. The form accepts $0/kg to $10000/kg. Required: the tool does not calculate until every input is valid.
Example
The form opens with $3/kg as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Cycle time per part
Illustration: Cycle time per partA timeline from a start mark to an end mark; Cycle time per part is the time between them.startendtExample: 45 sCycle time per part
What it is
The machine cycle time to make one part, from the start of bar feed to cut-off.
Units and format
Enter a number in s: seconds. The form accepts 0.000001 s to 100000 s. Required: the tool does not calculate until every input is valid.
Example
The form opens with 45 s as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Seconds, not minutes.
What this means: Bar change time
Illustration: Bar change timeA timeline from a start mark to an end mark; Bar change time is the time between them.startendtExample: 60 sBar change time
What it is
The time to load a new bar and restart, added once for each bar.
Units and format
Enter a number in s: seconds. The form accepts 0 s to 10000 s. Required: the tool does not calculate until every input is valid.
Example
The form opens with 60 s as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Hours per shift
Illustration: Hours per shiftA timeline from a start mark to an end mark; Hours per shift is the time between them.startendtExample: 8 hHours per shift
What it is
The number of working hours in one shift, used to convert machine hours into shifts.
Units and format
Enter a number in h: hours. The form accepts 0.000001 h to 24 h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 8 h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
What this means: Least material yield accepted
Illustration: Least material yield acceptedA bar of 100 parts with the share marked; Least material yield accepted is that share out of 100. The bar follows the value you type.0 %100 %Example: 75%Least material yield accepted
What it is
The lowest share of the purchased bar length that should end up in finished parts.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 0% to 100%. Required: the tool does not calculate until every input is valid.
Example
The form opens with 75% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.

Method and formulas

  1. Length per part = part + cut-off + facing; parts per bar = ⌊(bar − remnant) ÷ length per part⌋; bars = quantity ÷ parts per bar (rounded up) (as the screw machine stock tool).
  2. Yield = parts × part length ÷ (bars × bar length); material cost per part = bars × bar length × mass per metre × price ÷ quantity.
  3. Hours = (quantity × cycle + bars × bar change) ÷ 3600; shifts = hours ÷ hours per shift.
  4. Example: 109 parts per bar need 10 bars (36.576 kg), 83.333% yield, about 0.10973 of material a part and 12.667 hours of machine time.

Limitations

  • Whole parts per bar; last-bar remnants and set-up parts are not added.
  • Constant cycle time; tool changes and inspection add time.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Order bar stock for a turned-part batch
  • Quote material cost per part
  • Plan the run time on a bar-fed lathe

Who it is for

  • CNC machinists
  • Estimators
  • Production planners

What you get

  • Parts per bar, bars and stock mass
  • Material yield and cost per part
  • Machine hours and shifts

Interpreting the result

  • A thinner cut-off tool and a shorter remnant both raise yield: on short parts the cut-off can be most of the waste.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 1175–1176. Topic reference; no source tables or recommended settings are reproduced.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Bar Stock Plan for Bar-Fed Parts (Bars, Yield, Material Cost, Machine Time) calculator