BIZOMAT Tools · Manufacturing

Machine Load

How heavily loaded is this machine?

Compares the machine hours needed for demand with the hours available.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Demand / periodunitsUnits required in the period
Cycle timemin/unitCycle time per unit on this machine
Available machine hourshrScheduled machine hours in the period
Efficiency%Demonstrated machine efficiency

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Demand / period
Illustration: Demand / periodA row of identical items being counted; Demand / period is how many there are.nExample: 5000 unitsDemand / period
What it is
The number of units this machine must produce in the period, from orders or the production plan.
Units and format
Enter a number in units: a count of units. The form accepts 0 units or more.
Example
The form opens with 5000 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Required hours and utilisation rise in proportion.
Get it right
If several part numbers share the machine, run each one and add up the required hours.
What this means: Cycle time
Illustration: Cycle timeA timeline from a start mark to an end mark; Cycle time is the time between them.startendtExample: 1.8 min/unitCycle time
What it is
The machine time to produce one unit of this part, measured on the machine or taken from the routing.
Units and format
Enter a number in min/unit: min/unit. The form accepts 0 min/unit or more.
Example
The form opens with 1.8 min/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Required hours rise in proportion.
Get it right
Enter minutes per unit. Include set-up time here or in efficiency, but not both.
What this means: Available machine hours
Illustration: Available machine hoursA timeline from a start mark to an end mark; Available machine hours is the time between them.startendtExample: 180 hrAvailable machine hours
What it is
The scheduled hours the machine is planned to run in the period, from the shift pattern minus planned shutdowns.
Units and format
Enter a number in hr: hours. The form accepts 0.1 hr or more.
Example
The form opens with 180 hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
More hours lower utilisation.
Get it right
Use scheduled hours for the same period as the demand.
What this means: Efficiency
Illustration: EfficiencyInput on the left and useful output on the right with the loss split off; Efficiency is output divided by input.inputuseful outputlossηExample: 85%Efficiency
What it is
The share of machine time that turns into good output after breakdowns, set-ups, slow running and scrap, from recent records.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 1% to 100%.
Example
The form opens with 85% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Lower efficiency raises the required hours.
Get it right
Use a demonstrated figure, not the target. Type the percentage (85 for 85 %).

Method and formulas

  1. Required hours = demand × cycle ÷ 60 ÷ efficiency
  2. Utilisation = required ÷ available

Limitations

  • Set-up time must be in cycle time or efficiency
  • One part number at a time

Typical uses

  • Monthly loading checks
  • Deciding whether to move work between machines

Who it is for

  • Planners
  • Production managers

What you get

  • AVAILABLE, TIGHT or OVERLOADED
  • Required hours, utilisation and buffer

Interpreting the result

  • Add the load of all parts sharing the machine

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Machine Load calculator