Setup Reduction Value
Is reducing setup time worth the investment?
Values the time released by shorter changeovers and the payback on the improvement.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Current setup time | min | Measured current changeover time |
| Target setup time | min | Trialled or proven target changeover time |
| Changeovers / year | changes | Changeovers per year from production records |
| Combined hourly cost | $/hr | Hourly cost of the stopped machine and crew |
| Improvement investment | $ | Cost of tooling, fixtures and training for the faster set-up |
What each input means
Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.
What this means: Current setup time
- What it is
- How long a changeover takes today, from the last good part of one job to the first good part of the next, measured on the floor.
- Units and format
- Enter a number in min: minutes. The form accepts 0 min or more.
- Example
- The form opens with 60 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Minutes saved are current minus target, so a longer current time raises the value.
- Get it right
- Time several changeovers and use the average, including trial runs and adjustments.
What this means: Target setup time
- What it is
- The changeover time expected after the improvement, preferably proven in a trial rather than estimated.
- Units and format
- Enter a number in min: minutes. The form accepts 0 min or more.
- Example
- The form opens with 30 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- A shorter target raises the minutes saved and the annual value.
- Get it right
- Use a trialled time where possible; an optimistic target overstates the value.
What this means: Changeovers / year
- What it is
- The number of changeovers made on this machine or line in a year, from production records.
- Units and format
- Enter a number in changes: changes. The form accepts 0 changes or more.
- Example
- The form opens with 250 changes as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Hours released and annual value rise in proportion.
- Get it right
- If faster set-ups will lead to more, smaller batches, the released hours are reused rather than banked.
What this means: Combined hourly cost
- What it is
- The cost of one hour with the machine stopped for changeover, combining the machine rate and the crew who wait or do the set-up.
- Units and format
- Enter a number in $/hr: money per hour. The form accepts $0/hr or more.
- Example
- The form opens with $120/hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Annual value rises in proportion.
- Get it right
- Include everyone tied up in the changeover, not just the setter.
What this means: Improvement investment
- What it is
- The one-off cost of making set-ups faster: quick-change tooling, fixtures, presetting equipment and training.
- Units and format
- Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
- Example
- The form opens with $8000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
- Effect on the result
- Payback is this divided by annual value.
- Get it right
- Include internal time spent on the improvement project, not only purchases.
Method and formulas
- Hours released = (current − target) × changeovers ÷ 60
- Annual value = hours released × hourly cost
- Payback = investment ÷ annual value
Limitations
- Value is real only if the time is used
Typical uses
- SMED projects
- Justifying quick-change tooling
Who it is for
- Production engineers
- Lean practitioners
What you get
- Hours released and annual value
- Payback
Interpreting the result
- Faster set-ups also allow smaller batches and less inventory
References
- Shingo S., A Revolution in Manufacturing: The SMED System (Productivity Press, 1985)
Learn the Concepts Behind This Tool
These BIZOMAT Library readings explain the method this tool uses, with worked examples.
Method explained here · BIZOMAT original book
Choosing jobs and projects within a budget
In Shop Floor Optimisation by the Numbers
What it covers: Choose the projects or jobs that give the most benefit within a budget or capacity: the knapsack problem, ratio and largest-first rules, the fractional bound and exact table methods.
BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.