BIZOMAT Tools · Manufacturing

Yield and First-pass Yield

How much good output are you getting from input?

Calculates final yield and first-pass yield and shows the rework burden.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Units startedunitsUnits started in the period
Good unitsunitsGood units after any rework
Good first time (no rework)unitsUnits good first time without rework

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Units started
Illustration: Units startedA row of identical items being counted; Units started is how many there are.nExample: 10000 unitsUnits started
What it is
The number of units that entered the process in the period, whether they finished good, were reworked or were scrapped.
Units and format
Enter a number in units: a count of units. The form accepts 1 units or more.
Example
The form opens with 10000 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Both yields fall as more units are started for the same good output.
Get it right
Count units started, not units finished; yields are measured against this.
What this means: Good units
Illustration: Good unitsA row of identical items being counted; Good units is how many there are.nExample: 9600 unitsGood units
What it is
Units that ended up acceptable, including those that needed rework to get there.
Units and format
Enter a number in units: a count of units. The form accepts 0 units or more.
Example
The form opens with 9600 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Final yield is good ÷ started.
Get it right
It cannot exceed units started; the tool flags the data if it does.
What this means: Good first time (no rework)
Illustration: Good first time (no rework)A row of identical items being counted; Good first time (no rework) is how many there are.nExample: 9400 unitsGood first time (no rework)
What it is
Units that were acceptable the first time through, with no rework, repair or retest.
Units and format
Enter a number in units: a count of units. The form accepts 0 units or more.
Example
The form opens with 9400 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
First-pass yield is this ÷ started; good minus this gives reworked units.
Get it right
It cannot exceed good units; reworked units count in good, not here.

Method and formulas

  1. Final yield = good ÷ started
  2. First-pass yield = good first time ÷ started
  3. Reworked units = good − good first time

Limitations

  • Single step; multiply step yields for rolled throughput yield

Typical uses

  • Quality reporting
  • Spotting hidden rework

Who it is for

  • Quality engineers
  • Production supervisors

What you get

  • Final yield and first-pass yield
  • Lost and reworked units
  • Data checks

Interpreting the result

  • A gap between final and first-pass yield is hidden cost and capacity

References

  • Breyfogle F. W., Implementing Six Sigma (Wiley), first-pass and rolled throughput yield

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

  • Method explained here · BIZOMAT original book

    Defect density and the Poisson count

    In Defect Maps by the Numbers

    What it covers: Turning defect counts into a density per area, the Poisson model for counts on parts, comparing the counts it predicts with those found, and why defects per part misleads across part sizes.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Yield and First-pass Yield calculator