BIZOMAT MAKEOS · Money

Benefit–Cost Ratio

Do the discounted benefits of this project exceed its discounted costs, and by how much?

Present value of annual benefits and costs, initial investment and salvage at a discount rate, the benefit–cost ratio and the net benefit.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Initial investmentAUDUp-front cost.
Annual benefitsAUD/yrYearly benefits (savings, extra margin).
Annual operating costsAUD/yrYearly costs of running the project.
Salvage valueAUDValue recovered at the end.
LifeyearsYears of benefits.
Discount rate%Your organisation’s discount rate.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Initial investment
Illustration: Initial investmentA stack of coins and a note representing the money amount Initial investment.PExample: 100000 AUDInitial investment
What it is
The cash spent at the start of the project to put it in place: equipment, installation, design and commissioning.
Units and format
Enter a number in AUD: Australian dollars. The form accepts 0 AUD or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 100000 AUD as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A larger investment raises the present value of costs and lowers the ratio.
What this means: Annual benefits
Illustration: Annual benefitsA stack of coins and a note representing the money amount Annual benefits.BExample: 30000 AUD/yrAnnual benefits
What it is
The yearly benefit the project delivers, such as cost savings or extra margin, assumed the same each year of its life.
Units and format
Enter a number in AUD/yr: Australian dollars per year. The form accepts 0 AUD/yr or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 30000 AUD/yr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
The present value of benefits and the ratio rise in direct proportion.
Get it right
Count only benefits that become real cash or capacity you will use.
What this means: Annual operating costs
Illustration: Annual operating costsA stack of coins and a note representing the money amount Annual operating costs.CExample: 5000 AUD/yrAnnual operating costs
What it is
The yearly cost of running the project once it is in place: maintenance, energy, licences, consumables and support.
Units and format
Enter a number in AUD/yr: Australian dollars per year. The form accepts 0 AUD/yr or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 5000 AUD/yr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Higher running costs raise the present value of costs and lower the ratio.
Get it right
Do not include the initial investment here; it has its own field.
What this means: Salvage value
Illustration: Salvage valueA stack of coins and a note representing the money amount Salvage value.SExample: 10000 AUDSalvage value
What it is
The amount recovered at the end of the project’s life, for example from selling the equipment, which reduces the present value of costs.
Units and format
Enter a number in AUD: Australian dollars. The form accepts 0 AUD or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 10000 AUD as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use a cautious estimate; it is discounted over the full life.
What this means: Life
Illustration: LifeA timeline from a start mark to an end mark; Life is the time between them.startendnExample: 6 yearsLife
What it is
The number of years over which benefits and running costs are counted, normally the useful life of the project or the period your organisation uses for appraisals.
Units and format
Enter a number in years: years. The form accepts 1 years to 100 years. Use a whole number. Required: the tool does not calculate until every input is valid.
Example
The form opens with 6 years as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
More years add more discounted benefits and costs.
What this means: Discount rate
Illustration: Discount rateA bar of 100 parts with the share marked; Discount rate is that share out of 100. The bar follows the value you type.0 %100 %iExample: 8%Discount rate
What it is
The yearly rate used to convert future amounts into today’s money, set by your organisation as its discount or hurdle rate.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 0% to 100%. Required: the tool does not calculate until every input is valid.
Example
The form opens with 8% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A higher rate shrinks the present value of future benefits, costs and salvage.
Get it right
Type the percentage itself, not a fraction. A zero rate ignores the time value of money.

Method and formulas

  1. PV benefits = B × P/A(i, n); PV costs = P + C × P/A(i, n) − S × P/F(i, n).
  2. Conventional B/C = PV benefits ÷ PV costs; modified B/C = (PV benefits − PV operating costs) ÷ (P − PV salvage).
  3. Accept when B/C > 1.
  4. Example: the default project has B/C = 1.1873.

Limitations

  • Level annual amounts; uneven flows need the IRR tool’s year-by-year inputs.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Rank improvement projects
  • Present a project case to management
  • Compare with NPV and IRR results

Who it is for

  • Engineering managers
  • Cost estimators
  • Finance and business analysts

What you get

  • Present value of benefits and costs
  • Benefit–cost ratio (conventional and modified)
  • Net present benefit

Interpreting the result

  • B/C and NPV agree on accept/reject; for ranking projects of different size, compare incremental B/C.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 140–144. Topic reference; no source tables or recommended settings are reproduced.

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Benefit–Cost Ratio calculator