Learning Curve Unit Time and Cost

How long will the nth unit take, and what will the batch cost, as the team learns?

Unit time, cumulative time and average time per unit on a Wright learning curve from the first-unit time and learning rate, with labour cost for the batch.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Time for the first unithTime for the first unit, from a trial build or estimate.
Learning rate%Time for a doubled quantity as a percentage of the earlier time (assembly often 80–90%, machining 90–95%).
Number of unitsunitsNumber of units in the batch.
Labour rateAUD/hLabour cost per hour.

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Time for the first unit
Illustration: Time for the first unitA timeline from a start mark to an end mark; Time for the first unit is the time between them.startendT₁Example: 10 hTime for the first unit
What it is
The hours taken to make the very first unit, from a trial build, a time study or an estimate.
Units and format
Enter a number in h: hours. The form accepts 0.000001 h to 1000000 h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 10 h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Every unit time, the cumulative time and the batch cost rise in proportion.
Get it right
Enter hours, not minutes: 30 minutes is 0.5 hours.
What this means: Learning rate
Illustration: Learning rateA bar of 100 parts with the share marked; Learning rate is that share out of 100. The bar follows the value you type.0 %100 %rExample: 85%Learning rate
What it is
The time for each doubled quantity as a percentage of the earlier time; for example the second unit compared with the first.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 50% to 100%. Required: the tool does not calculate until every input is valid.
Example
The form opens with 85% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A lower learning rate makes later units faster and lowers cumulative time.
Get it right
Type the percentage. A lower percentage means faster learning; take it from your own history for similar work.
What this means: Number of units
Illustration: Number of unitsA row of identical items being counted; Number of units is how many there are.nExample: 50 unitsNumber of units
What it is
The number of units in the batch, counting from the first unit ever built.
Units and format
Enter a number in units: a count of units. The form accepts 1 units to 100000 units. Use a whole number. Required: the tool does not calculate until every input is valid.
Example
The form opens with 50 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
The curve counts cumulative units; a repeat order continues from where the earlier batch ended.
What this means: Labour rate
Illustration: Labour rateA price tag on one unit of measure; Labour rate is the cost for each unit (per hour, per kilogram and so on).Clcost foreach unitExample: 80 AUD/hLabour rate
What it is
The labour cost per hour used to turn the cumulative time into a batch labour cost.
Units and format
Enter a number in AUD/h: Australian dollars per hour. The form accepts 0 AUD/h to 100000 AUD/h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 80 AUD/h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Batch cost rises in direct proportion.
Get it right
Use the loaded rate from your finance team if overhead should be included.

Method and formulas

  1. Unit time Tₙ = T₁ n^b, with b = log₂(learning rate).
  2. Cumulative time = Σ Tᵢ for i = 1…n; average = cumulative ÷ n.
  3. Batch cost = cumulative time × labour rate.
  4. Example: at 85%, unit 50 takes 3.9962 h and the batch averages 5.1026 h per unit.

Limitations

  • Learning flattens out; production standards eventually limit times.
  • Breaks in production cause forgetting and higher times.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Quote new products with falling labour time
  • Plan staffing for a ramp-up
  • Check whether production times are improving as expected

Who it is for

  • Estimators
  • Production planners
  • Industrial engineers

What you get

  • Time for the nth unit
  • Cumulative and average time
  • Labour cost of the batch

Interpreting the result

  • Use average time for quoting a batch and unit time for planning the end of the run.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 146. Topic reference; no source tables or recommended settings are reproduced.

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Learning Curve Unit Time and Cost calculator