BIZOMAT MAKEOS · Money

Machine Hour Rate

What does this machine cost per productive hour to own and run?

Hourly cost of a machine from capital recovery, floor space, power, maintenance, tooling and consumables over its productive hours, with operator cost to give a full machine-and-operator rate for quoting.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Installed machine costAUDPurchase price including installation and commissioning.
Resale value at end of lifeAUDExpected resale value at the end of its economic life.
Economic lifeyearsYears the machine will be used economically.
Interest (discount) rate%Your cost of capital.
Productive hours per yearhHours per year the machine actually produces (not attendance hours).
Floor space cost per yearAUD/yrShare of building cost for the machine’s floor area.
Average power drawn when runningkWAverage electrical demand while producing.
Electricity priceAUD/kWhElectricity price.
Maintenance per yearAUD/yrPlanned and breakdown maintenance per year.
Tooling and consumables per hourAUD/hCutting tools, coolant and consumables per productive hour.
Operator cost per hour (fully loaded)AUD/hOperator wage plus on-costs per hour (0 for machine-only rate).

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Installed machine cost
Illustration: Installed machine costA stack of coins and a note representing the money amount Installed machine cost.PExample: 350000 AUDInstalled machine cost
What it is
The full cost of getting the machine into production: purchase price plus freight, foundations, installation, commissioning and initial training.
Units and format
Enter a number in AUD: Australian dollars. The form accepts 0.000001 AUD or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 350000 AUD as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A higher installed cost raises the capital recovery and the hourly rate.
Get it right
Use the installed cost, not the quoted machine price alone.
What this means: Resale value at end of life
Illustration: Resale value at end of lifeA stack of coins and a note representing the money amount Resale value at end of life.SExample: 50000 AUDResale value at end of life
What it is
What you expect to recover by selling the machine at the end of its economic life, less any cost of removal.
Units and format
Enter a number in AUD: Australian dollars. The form accepts 0 AUD or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 50000 AUD as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A higher resale value lowers the capital recovery per year.
Get it right
Use a cautious estimate; resale values of specialised machines can be low.
What this means: Economic life
Illustration: Economic lifeA timeline from a start mark to an end mark; Economic life is the time between them.startendnExample: 10 yearsEconomic life
What it is
The number of years the machine will be used before it is replaced for economic reasons, which is often shorter than its physical life.
Units and format
Enter a number in years: years. The form accepts 1 years to 50 years. Use a whole number. Required: the tool does not calculate until every input is valid.
Example
The form opens with 10 years as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A longer life spreads the capital over more years and lowers the hourly rate.
Get it right
This is the economic life for costing, not the tax depreciation period.
What this means: Interest (discount) rate
Illustration: Interest (discount) rateA bar of 100 parts with the share marked; Interest (discount) rate is that share out of 100. The bar follows the value you type.0 %100 %iExample: 8%Interest (discount) rate
What it is
Your organisation’s cost of capital: the yearly return the money tied up in the machine must earn, usually set by your finance team.
Units and format
Enter a number in %: percent: the number is read as a percentage, so type 8 for 8 %. The form accepts 0% to 100%. Required: the tool does not calculate until every input is valid.
Example
The form opens with 8% as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
A higher rate raises the capital recovery per year.
Get it right
Type the percentage itself, not a fraction.
What this means: Productive hours per year
Illustration: Productive hours per yearA timeline from a start mark to an end mark; Productive hours per year is the time between them.startendhExample: 3000 hProductive hours per year
What it is
The hours per year the machine actually makes parts, after allowing for set-ups, breakdowns, idle time and unmanned shifts. All fixed yearly costs are spread over these hours.
Units and format
Enter a number in h: hours. The form accepts 0.000001 h to 8784 h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 3000 h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Fixed costs per hour are inversely proportional to productive hours.
Get it right
Use measured productive hours, not shift or attendance hours; overstating them understates the rate.
What this means: Floor space cost per year
Illustration: Floor space cost per yearA stack of coins and a note representing the money amount Floor space cost per year.$Example: 8000 AUD/yrFloor space cost per year
What it is
The yearly building cost charged to the floor area the machine and its access space occupy: rent or depreciation, rates, lighting and heating per square metre.
Units and format
Enter a number in AUD/yr: Australian dollars per year. The form accepts 0 AUD/yr or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 8000 AUD/yr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Include the access and storage area around the machine, not just its footprint.
What this means: Average power drawn when running
Illustration: Average power drawn when runningA motor driving a shaft; Average power drawn when running is the rate at which it does work, energy per second.PExample: 12 kWAverage power drawn when running
What it is
The average electrical power the machine draws while it is producing, measured with a power meter or estimated from the motor ratings and typical load.
Units and format
Enter a number in kW: kilowatts. The form accepts 0 kW to 100000 kW. Required: the tool does not calculate until every input is valid.
Example
The form opens with 12 kW as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Power cost per hour is this power times the electricity price.
Get it right
Average draw is usually well below the total of motor nameplate ratings; measure it if you can.
What this means: Electricity price
Illustration: Electricity priceA price tag on one unit of measure; Electricity price is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: 0.25 AUD/kWhElectricity price
What it is
What you pay per kilowatt-hour of electricity, from your energy bill.
Units and format
Enter a number in AUD/kWh: Australian dollars per kilowatt-hour. The form accepts 0 AUD/kWh to 100 AUD/kWh. Required: the tool does not calculate until every input is valid.
Example
The form opens with 0.25 AUD/kWh as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Power cost per hour rises in direct proportion to the price.
Get it right
Include network and demand charges for a realistic figure.
What this means: Maintenance per year
Illustration: Maintenance per yearA stack of coins and a note representing the money amount Maintenance per year.$Example: 12000 AUD/yrMaintenance per year
What it is
The yearly cost of keeping the machine running: planned servicing, spare parts, breakdown repairs and service contracts.
Units and format
Enter a number in AUD/yr: Australian dollars per year. The form accepts 0 AUD/yr or more. Required: the tool does not calculate until every input is valid.
Example
The form opens with 12000 AUD/yr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Get it right
Use records from similar machines; maintenance usually rises as a machine ages.
What this means: Tooling and consumables per hour
Illustration: Tooling and consumables per hourA price tag on one unit of measure; Tooling and consumables per hour is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: 15 AUD/hTooling and consumables per hour
What it is
The cost of cutting tools, coolant, lubricants and other consumables used for each productive hour, from your tooling spend divided by productive hours.
Units and format
Enter a number in AUD/h: Australian dollars per hour. The form accepts 0 AUD/h to 1000000 AUD/h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 15 AUD/h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Added directly to the machine rate.
What this means: Operator cost per hour (fully loaded)
Illustration: Operator cost per hour (fully loaded)A price tag on one unit of measure; Operator cost per hour (fully loaded) is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: 65 AUD/hOperator cost per hour (fully loaded)
What it is
The full hourly cost of the operator: wage plus superannuation, payroll tax, leave, insurance and other on-costs. Zero gives a machine-only rate.
Units and format
Enter a number in AUD/h: Australian dollars per hour. The form accepts 0 AUD/h to 1000000 AUD/h. Required: the tool does not calculate until every input is valid.
Example
The form opens with 65 AUD/h as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Added directly to give the machine-and-operator rate.
Get it right
If one operator runs several machines, enter only the share of their cost for this machine.

Method and formulas

  1. Capital recovery per year = (cost − salvage) × A/P(i, n) + salvage × i.
  2. Hourly cost = (capital + space + maintenance) ÷ productive hours + power × price + tooling.
  3. Machine-and-operator rate = machine rate + operator cost.
  4. Example: the default machine costs $40.90 per hour, or $106 with an operator.

Limitations

  • Excludes general factory overheads (supervision, administration, quality) unless included in the inputs.
  • Productive hours are the most sensitive input.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Set shop rates for quoting
  • Compare the cost of running old and new machines
  • Decide whether to outsource an operation

Who it is for

  • Engineering managers
  • Cost estimators
  • Finance and business analysts

What you get

  • Capital cost per hour
  • Running cost per hour
  • Machine rate and machine-plus-operator rate

Interpreting the result

  • Under-utilised machines have high hourly rates; quote on realistic productive hours.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 134–146, 1153–1160. Topic reference; no source tables or recommended settings are reproduced.

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Machine Hour Rate calculator