BIZOMAT Tools · Operations

OEE and Downtime Analysis

How effectively is this production asset being used?

Calculates OEE from raw production data and shows where the planned time went, with data checks and downtime cost.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Planned production timeminPlanned production time (excluding planned breaks)
DowntimeminUnplanned and changeover stoppages from the downtime log
Ideal cycle timesec/unitDesign or best demonstrated cycle time in seconds
Total units producedunitsUnits produced (counter)
Good unitsunitsUnits right first time (quality records)
Estimated downtime cost$/hrCost of one hour of downtime (lost contribution plus idle cost)

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Planned production time
Illustration: Planned production timeA timeline from a start mark to an end mark; Planned production time is the time between them.startendtExample: 480 minPlanned production time
What it is
The time the equipment was scheduled to run in the period, after planned breaks and planned no-production time are removed.
Units and format
Enter a number in min: minutes. The form accepts 1 min or more.
Example
The form opens with 480 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Availability is run time ÷ planned time, so this is the base for all three factors.
Get it right
Exclude planned breaks; include changeovers, because they are counted as downtime.
What this means: Downtime
Illustration: DowntimeA timeline from a start mark to an end mark; Downtime is the time between them.startendtExample: 60 minDowntime
What it is
Minutes the equipment was stopped during planned time: breakdowns, changeovers, waiting for material and other stops, from the downtime log.
Units and format
Enter a number in min: minutes. The form accepts 0 min or more.
Example
The form opens with 60 min as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Each minute lowers availability and adds to downtime cost.
Get it right
It cannot exceed planned time; the tool flags the data if it does.
What this means: Ideal cycle time
Illustration: Ideal cycle timeA timeline from a start mark to an end mark; Ideal cycle time is the time between them.startendtExample: 30 sec/unitIdeal cycle time
What it is
The fastest time the equipment can make one unit, from the design rating or the best sustained rate demonstrated.
Units and format
Enter a number in sec/unit: sec/unit. The form accepts 0.01 sec/unit or more.
Example
The form opens with 30 sec/unit as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Performance rises in proportion to the ideal cycle time.
Get it right
Enter seconds, not minutes. Too long an ideal cycle pushes performance over 100 % and flags the data.
What this means: Total units produced
Illustration: Total units producedA row of identical items being counted; Total units produced is how many there are.nExample: 700 unitsTotal units produced
What it is
Every unit the equipment produced in the planned time, good or bad, from the machine counter.
Units and format
Enter a number in units: a count of units. The form accepts 0 units or more.
Example
The form opens with 700 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
More units raise performance but lower quality if good units stay the same.
Get it right
Include scrap and rework units; the good count is entered separately.
What this means: Good units
Illustration: Good unitsA row of identical items being counted; Good units is how many there are.nExample: 665 unitsGood units
What it is
Units that passed first time without rework or scrap, from quality records.
Units and format
Enter a number in units: a count of units. The form accepts 0 units or more.
Example
The form opens with 665 units as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Quality is good ÷ total, so it rises in proportion.
Get it right
It cannot exceed the total count. Reworked units are not good units here.
What this means: Estimated downtime cost
Illustration: Estimated downtime costA price tag on one unit of measure; Estimated downtime cost is the cost for each unit (per hour, per kilogram and so on).$cost foreach unitExample: $180/hrEstimated downtime cost
What it is
The money lost for each hour the equipment is down: lost contribution on missed output plus idle labour and other running costs.
Units and format
Enter a number in $/hr: money per hour. The form accepts $0/hr or more.
Example
The form opens with $180/hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Downtime cost is downtime hours × this rate; it does not change OEE.
Get it right
Agree the rate with finance; using full selling price overstates the loss if the output can be recovered later.

Method and formulas

  1. Availability = (planned − downtime) ÷ planned
  2. Performance = ideal cycle × total ÷ run time (capped at 100%)
  3. Quality = good ÷ total
  4. OEE = availability × performance × quality = fully productive time ÷ planned time

Limitations

  • Performance above 100% indicates an ideal cycle time that is too long or a wrong count
  • Rework counts as a quality loss

Typical uses

  • Weekly OEE reporting
  • Finding the biggest loss on a machine
  • Valuing downtime

Who it is for

  • Maintenance and production managers
  • Continuous-improvement teams

What you get

  • OEE and its three factors
  • Time-loss table
  • Data checks and downtime cost

Interpreting the result

  • Attack the largest loss in the time table first
  • Fix data faults before acting on the numbers

References

  • Nakajima S., Introduction to TPM: Total Productive Maintenance (Productivity Press, 1988)

Learn the Concepts Behind This Tool

These BIZOMAT Library readings explain the method this tool uses, with worked examples.

Learning pathway

Measure and value equipment losses

Learn how OEE separates availability, performance and quality losses, then analyse a production period of your own.

  1. 1 Learn

    Read Measuring productivity: output per input, labour measures and overall equipment effectiveness in Lean, Maintenance and Continuous Improvement.

    How to measure productivity in a small business or factory: the output–input formula, choosing the right measures, OEE with a worked example, the six big losses, and avoiding perverse targets.

  2. 2 Apply

    Open OEE and Downtime Analysis and enter your own figures.

    How effectively is this production asset being used?

  3. 3 Verify

    Read the tool’s feasibility and verification checks under the result, and test your answer against its stated limitations:

    • Performance above 100% indicates an ideal cycle time that is too long or a wrong count
    • Rework counts as a quality loss
  4. 4 Improve

    Download the decision report or copy the link with your inputs to keep a record, then change one assumption at a time and compare.

    Next reading: Putting a dollar value on equipment losses: using OEE to guide capacity and capital decisions in Valuing Time, Delay and Uncertainty.

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the OEE and Downtime Analysis calculator