BIZOMAT Tools · Projects

Project Size and Governance

How large and complex is this project?

Classifies a project as small, medium or major from budget, duration, stakeholders and complexity, and suggests a matching governance level.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Budget$Approved or estimated total budget
DurationmonthsPlanned duration
Key stakeholder groupsgroupsCount of distinct stakeholder groups (customers, regulators, suppliers, internal teams)
Technical complexity1–5 scoreTechnical complexity rating (1 routine, 5 novel)

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Budget
Illustration: BudgetA stack of coins and a note representing the money amount Budget.$Example: $100000Budget
What it is
The total approved or estimated cost of the project from start to finish, used to judge how much governance it needs.
Units and format
Enter a number in $: an amount of money; use one currency for every money input. The form accepts $0 or more.
Example
The form opens with $100000 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds up to 30 points; budgets above the A$500,000 screening point add nothing more.
Get it right
Use the whole-of-project budget, not just the current phase or this year’s spend.
What this means: Duration
Illustration: DurationA timeline from a start mark to an end mark; Duration is the time between them.startendtExample: 6 monthsDuration
What it is
How long the project is planned to run from start to handover, in calendar months.
Units and format
Enter a number in months: months. The form accepts 0.1 months or more.
Example
The form opens with 6 months as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds up to 20 points; durations beyond 18 months add nothing more.
Get it right
Convert weeks to months (about 4.3 weeks per month) rather than typing weeks.
What this means: Key stakeholder groups
Illustration: Key stakeholder groupsA row of identical items being counted; Key stakeholder groups is how many there are.nExample: 5 groupsKey stakeholder groups
What it is
The number of distinct groups with a real stake in the project, such as customers, regulators, suppliers, unions and internal departments.
Units and format
Enter a number in groups: groups. The form accepts 1 groups or more.
Example
The form opens with 5 groups as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Adds up to 20 points; more than 10 groups add nothing more.
Get it right
Count groups, not individual people: five people from one department are one group.
What this means: Technical complexity
Illustration: Technical complexityA scale from the lowest to the highest score with a marker at the chosen score for Technical complexity. The marker follows the slider.15lowhighExample: 3Technical complexity
What it is
How technically difficult the work is, rated 1 (routine work done many times before) to 5 (novel, untried or highly integrated).
Units and format
Move the slider to a score from 1 (low) to 5 (high).
Example
The form opens with 3 as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Each point adds 6 points to the scale score.
Get it right
Rate the technical challenge, not the size; a large but routine job can still be a 1 or 2.

Method and formulas

  1. Score = 30 × min(budget ÷ 500,000, 1) + 20 × min(months ÷ 18, 1) + 20 × min(groups ÷ 10, 1) + 30 × complexity ÷ 5
  2. SMALL below 35, MEDIUM 35–64, MAJOR 65 or more

Limitations

  • Saturation points (A$500k, 18 months, 10 groups) are screening defaults
  • Does not consider regulatory or safety criticality

Typical uses

  • Setting up governance at project start
  • Choosing reporting frequency and assurance

Who it is for

  • PMOs
  • Sponsors
  • Project managers

What you get

  • SMALL, MEDIUM or MAJOR
  • Scale score
  • Indicative governance table

Interpreting the result

  • Replace the thresholds with your organisation’s project classification if it has one

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.