Resource Fit

Do you have enough people-hours to deliver?

Compares required effort with the team’s available hours to show utilisation and buffer.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Required efforthrEffort estimate from the work breakdown
Available peoplepeoplePeople assigned to the work
Available hours / personhrNet hours each person can give the project in the period

What each input means

Open an input to see what it is, its units, the worked example and the common mistakes, with a small diagram.

What this means: Required effort
Illustration: Required effortA timeline from a start mark to an end mark; Required effort is the time between them.startendtExample: 800 hrRequired effort
What it is
The total hours of work the task or project needs in the period, added up from the work breakdown or estimate.
Units and format
Enter a number in hr: hours. The form accepts 0 hr or more.
Example
The form opens with 800 hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Divided by available hours to give utilisation; more required effort raises it in proportion.
Get it right
Include reviews, testing and rework, which are often left out of first estimates.
What this means: Available people
Illustration: Available peopleA row of identical items being counted; Available people is how many there are.nExample: 3 peopleAvailable people
What it is
How many people are assigned and able to work on this effort during the period.
Units and format
Enter a number in people: people. The form accepts 1 people or more.
Example
The form opens with 3 people as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Multiplied by hours per person to give total available hours.
Get it right
The tool assumes everyone can do any of the work; check skills separately.
What this means: Available hours / person
Illustration: Available hours / personA timeline from a start mark to an end mark; Available hours / person is the time between them.startendtExample: 300 hrAvailable hours / person
What it is
The net hours each person can actually give this work over the whole period, after leave, meetings, support duties and other projects.
Units and format
Enter a number in hr: hours. The form accepts 0 hr or more.
Example
The form opens with 300 hr as a worked example. It is an illustration, not a recommended value: replace it with your own figure.
Effect on the result
Multiplied by people to give capacity; more hours lowers utilisation.
Get it right
This is hours across the period, not per week; a full-time roster figure overstates capacity.

Method and formulas

  1. Capacity = people × available hours per person
  2. Utilisation = required ÷ capacity
  3. COMFORTABLE to 85%, TIGHT to 100%, OVERLOADED above

Limitations

  • Treats people as interchangeable
  • Ignores sequencing and skill constraints

Typical uses

  • Checking a plan before committing
  • Deciding whether to add people or reduce scope

Who it is for

  • Project managers
  • Team leaders

What you get

  • COMFORTABLE, TIGHT or OVERLOADED
  • Utilisation and buffer hours

Interpreting the result

  • Plan at about 85% to allow for variation and unplanned work

BIZOMAT tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.